28,000 ft2 fit out contract
Contract Sum approx £800k
Contract duration 13 weeks
JCT 2005 Design and Build Contract

“It has been a pleasure to work with HP Construction on the fit out of JRI’s 58,000 sq ft production facility. Special thanks should be given to the HPC site team whose professional and enthusiastic approach provided very practical solutions. The project has been a terrific example of teamwork and produced a first class building to a high standard”
Keith Jackson – Technical Director – Joint Replacement Instrumentation Ltd

Joint Replacement Instrumentation Limited is a British manufacturer of orthopaedic implants and surgical instrumentation.